69 KV Electric Transmission Line Proposed Construction, Teckla to Conoco Uranium Mine, Campbell County, Environmental Assessment (EA).

69 KV Electric Transmission Line Proposed Construction, Teckla to Conoco Uranium Mine, Campbell County, Environmental Assessment (EA).
Author :
Publisher :
Total Pages : 20
Release :
ISBN-10 : NWU:35556030211353
ISBN-13 :
Rating : 4/5 (53 Downloads)

Book Synopsis 69 KV Electric Transmission Line Proposed Construction, Teckla to Conoco Uranium Mine, Campbell County, Environmental Assessment (EA). by :

Download or read book 69 KV Electric Transmission Line Proposed Construction, Teckla to Conoco Uranium Mine, Campbell County, Environmental Assessment (EA). written by and published by . This book was released on 1983 with total page 20 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Chalk Point-Lexington Park 230 KV Transmission Line

Chalk Point-Lexington Park 230 KV Transmission Line
Author :
Publisher :
Total Pages : 546
Release :
ISBN-10 : NWU:35556030173637
ISBN-13 :
Rating : 4/5 (37 Downloads)

Book Synopsis Chalk Point-Lexington Park 230 KV Transmission Line by :

Download or read book Chalk Point-Lexington Park 230 KV Transmission Line written by and published by . This book was released on 1977 with total page 546 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Rycevile-Lexington Park 230 KV Transmission Line

Rycevile-Lexington Park 230 KV Transmission Line
Author :
Publisher :
Total Pages : 172
Release :
ISBN-10 : NWU:35556030173603
ISBN-13 :
Rating : 4/5 (03 Downloads)

Book Synopsis Rycevile-Lexington Park 230 KV Transmission Line by :

Download or read book Rycevile-Lexington Park 230 KV Transmission Line written by and published by . This book was released on 1974 with total page 172 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska

Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska
Author :
Publisher :
Total Pages : 170
Release :
ISBN-10 : OCLC:68351904
ISBN-13 :
Rating : 4/5 (04 Downloads)

Book Synopsis Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska by :

Download or read book Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska written by and published by . This book was released on 1995 with total page 170 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

Taos-San Luis Valley 345 KV Transmission Line

Taos-San Luis Valley 345 KV Transmission Line
Author :
Publisher :
Total Pages : 264
Release :
ISBN-10 : NWU:35556030183602
ISBN-13 :
Rating : 4/5 (02 Downloads)

Book Synopsis Taos-San Luis Valley 345 KV Transmission Line by :

Download or read book Taos-San Luis Valley 345 KV Transmission Line written by and published by . This book was released on 1984 with total page 264 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Marys Lake 69/115-kV Transmission Line Upgrade and Substation Expansion Projects

Marys Lake 69/115-kV Transmission Line Upgrade and Substation Expansion Projects
Author :
Publisher :
Total Pages : 212
Release :
ISBN-10 : OCLC:1066004969
ISBN-13 :
Rating : 4/5 (69 Downloads)

Book Synopsis Marys Lake 69/115-kV Transmission Line Upgrade and Substation Expansion Projects by :

Download or read book Marys Lake 69/115-kV Transmission Line Upgrade and Substation Expansion Projects written by and published by . This book was released on 1996 with total page 212 pages. Available in PDF, EPUB and Kindle. Book excerpt: Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

Environmental Assessment

Environmental Assessment
Author :
Publisher :
Total Pages : 242
Release :
ISBN-10 : UCR:31210011095658
ISBN-13 :
Rating : 4/5 (58 Downloads)

Book Synopsis Environmental Assessment by : United States. Western Area Power Administration. Loveland Area Office

Download or read book Environmental Assessment written by United States. Western Area Power Administration. Loveland Area Office and published by . This book was released on 1994 with total page 242 pages. Available in PDF, EPUB and Kindle. Book excerpt: